Learning Disaster Prevention from the Niigata Chuetsu Earthquake | A Major Earthquake in a Mountainous Region and the Path to Recovery

Overview of the Niigata-ken Chuetsu Earthquake

On October 23, 2004, at 5:56 PM, a magnitude 6.8 earthquake struck with its epicenter in the Chuetsu region of Niigata Prefecture. The focal depth was 13 km, and Kawaguchi Town (currently Nagaoka City) recorded a seismic intensity of 7, marking the first time a seismic intensity of 7 was registered on an intensity meter. The earthquake caused severe damage, resulting in 68 fatalities, 4,805 injuries, 3,175 completely destroyed residential buildings, and 13,810 partially destroyed residential buildings. Active aftershocks continued following the main shock, with two earthquakes recording a maximum seismic intensity of Upper 6 on the same day.

A major lesson left by this earthquake is that preparing solely for strong shaking is not enough. Cascading challenges emerged following the disaster—including the disruption of roads and isolation of communities due to landslides, prolonged evacuation living, and health risks associated with staying in vehicles. In this article, as we reflect on the damage and the path to recovery, we consider the preparations that households, local communities, and companies should apply to disaster preparedness today.

Damage Caused by Shaking and the Impact on the Region

The Chuetsu region is a semi-mountainous area characterized by many steep slopes. Strong shaking triggered a series of slope failures and landslides, leading to severed roads, isolated communities, and river channel blockages caused by accumulated sediment. In river channel blockages, water backed up upstream, requiring vigilance against flooding and dam breaks. A total of 61 communities across 7 cities, towns, and villages, comprising 1,938 households, became isolated, making rescue operations and supply transport difficult, as well as complicating the restoration of power, communications, and water supplies.

In addition, an operational Joetsu Shinkansen train derailed, marking the first time a bullet train derailed while in service. Although there were no casualties, it was an event that demonstrated how roads, railways, and lifelines can be impacted simultaneously. Local disaster risk management requires anticipating alternative routes and communication channels in cases where primary roads are unusable.

Source: Niigata Local Meteorological Observatory

Evacuation Life and the Path to Recovery

In Yamakoshi Village (currently Nagaoka City), over 2,000 residents were evacuated outside the village due to severed roads and the danger of secondary disasters, and it took approximately three years until residents could return. In evacuation centers and temporary housing, life reconstruction proceeded while preserving community ties at the village level and giving careful consideration to school operations. As restoring roads and housing moved forward, regenerating livelihoods and local culture posed long-term challenges, and maintaining the local community served as a driving force supporting the return to the village and overall recovery.

Following the disaster, the number of evacuees exceeded 100,000 at its peak, and life in shelters such as schools and public facilities continued. During evacuation life, securing sanitary environments, health management, and privacy became key challenges alongside food and water supplies. To avoid the anxiety of aftershocks and overcrowding at evacuation centers, many people chose to sleep in their vehicles. Remaining in the same posture for extended periods inside a cramped vehicle carries the risk of leading to health complications such as thrombosis.

Protecting Health and Life After a Disaster

According to tabulations by Niigata Prefecture, 52 out of the 68 fatalities were classified as disaster-related deaths. The underlying factors extended beyond sleeping in vehicles to include various causes such as exhaustion from evacuation living, environmental changes, and the worsening of pre-existing medical conditions.

In addition to improving sanitary environments and privacy in evacuation centers, establishing a framework to track home evacuees and vehicle evacuees, continuously monitor their health, and provide ongoing information is essential. Continuous support is especially critical for those susceptible to the effects of environmental changes, including the elderly, individuals with underlying health conditions, and households with infants. Ensuring that no one is left behind by support efforts is another key role of disaster preparedness.

Reevaluating Everyday Preparedness

At home, in addition to securing furniture and checking evacuation routes, prepare food, water, regular medications, portable toilets, and mobile power banks. Anticipating prolonged power outages and water disruptions, it is also important to review emergency stock contents according to regional and seasonal needs. Preparing for isolation by designating multiple communication methods and meeting locations with family members provides added peace of mind.

For companies and local governments, there is a need to establish Business Continuity Plans (BCP)—including backup sites, contact networks, emergency power supplies, and coordination with business partners—under the premise that roads, communications, and power may shut down simultaneously. A plan must not end at creation; verifying its practical effectiveness through training exercises is key.

Regarding buildings, the fundamental step is to perform a seismic diagnosis and select reinforcement methods tailored to the structure and degree of deterioration. Aster Power Coating, handled by SAKIGAKE JAPAN Corp., is a seismic retrofitting and reinforcement coating formulated with special fibers. Designed with the aim of suppressing exterior wall flaking, concrete deterioration, and damage risks during earthquakes, it represents one option for repairing and extending the operational lifespan of existing structures. It is important to confirm applicability for each building and evaluate it alongside expert diagnoses and other reinforcement methods.

Summary

The Niigata-ken Chuetsu Earthquake demonstrated that disaster impacts cascade even after the initial shaking—through the isolation of mountainous communities, prolonged evacuation, and disaster-related deaths. Rather than stopping at simply knowing about past disasters, specifically reevaluating preparedness at home, in the workplace, and within local communities is the first step toward reducing damage.

References